georgedixon21 georgedixon21
  • 19-04-2018
  • Mathematics
contestada

a machine takes 4.2 hours to make 7 parts . At that rate how many parts can the machine make in 28.8 hours.

Respuesta :

angelgarciapd1 angelgarciapd1
  • 19-04-2018
17.28 because 4.2 divided by 7 is .6 then .6 times 28.8 is 17.28
Answer Link

Otras preguntas

a dive instructor begins his lesson on the shore. As he guides his students out into the water,what zone are they in?
south africa's economy was helped by its _____?
subtract 6x^2-5x+3 from (3x^2+8x-4)
What is more I centimeter or 1 kilo
which of the following was the final colonial war between france and england
What does the "proof" mean on a bottle of liquor? i know that 100 proof liquor is 50% alocohol and 80 proof is 40% and so on. but where does the term "proof" co
Peyton Manning threw for 1,126 yards in his first four games. At this rate, how many yards will he throw for in sixteen games?
Assume the atomic mass of element x is 22.99 amu. A 22.42 g sample of x combines with 34.56 g of another element y to form a compound xy. Calculate the atomic m
-6x+14=12-8x what is -6x plus 14 equals12 - 8
The least common multiple of two numbers is 60, and one of the numbers is 7 less than the other number. What are the numbers?