Respuesta :
					                   Let x be the weeks worked on building the road
13=(1/2)x
13*2=x
26 days=x
In the duration of 26 weeks, the road should be built.
Hope I helped :)
					                
					             13=(1/2)x
13*2=x
26 days=x
In the duration of 26 weeks, the road should be built.