itstimmays9909 itstimmays9909
  • 20-10-2017
  • Business
contestada

​frito-lay production personnel obtain a sample every​ ______ minutes.

Respuesta :

LearnGrow
LearnGrow LearnGrow
  • 01-11-2017

Frito-Lay North America is the $11 billion convenient foods business unit of PepsiCo. Frito-lay production personnel obtain a sample every​ 45 minutes. Troubleshooting is made every 45 minutes. This means that every 45 minutes is checked If the production is fine and the quality of the product is checked.

Answer Link

Otras preguntas

Smoking reduces a person's life span by an average of __________. a. 1 to 2 years b. 4 to 5 years c. 10 to 11 years d. 13 to 14 years
find the equation of a circle that is tangent to the x-axis at (5,0) and tangent to the y-axis at (0,-5).
Part B if u want part A too
find the next number sequence 6,11,16,21
Granite and _____ have similar chemistries. A.Basalt B. Diorite C. Rhyolite D. Andesite
what is suface area of a cone with 16in radius and 38in hight?
Which of the following statements best describes the role of the caste system in India today?
Why do the children end up in the wardrobe? A. They are hiding from Mrs. Macready. B. They are looking for coats. C. They are bored. D. They are pl
The structure of the poem “Tattoo” by Gregg Shapiro can be described best as __________.
Select the sentence in which the verb correctly agrees with the subject.         A. A copy of Moby  and several magazines has disappeared from my room.   B. Pe