ewaschenbeckeroy3cdx ewaschenbeckeroy3cdx
  • 20-10-2017
  • Business
contestada

True or false slab at grade foundations require water supply and wastewater piping to be installed before concrete is placed.

Respuesta :

sopie1 sopie1
  • 20-10-2017
false slab grade foundations tend to be instslled using a non govermental orgization whih also doesnt make it necessary to require water suppply and wastewater piping to be installed before concrete is placed.
Answer Link
adrian2477
adrian2477 adrian2477
  • 20-10-2017
False it is not true because it is false
Answer Link

Otras preguntas

pleasse help Which group on the periodic table contains only metals? the last group along the bottom along the top the second group
how long are the hard rocks formed by the sediments section only
lonic compounds form because ______ attract.Plz help I need this now! :)​
The graph shows a proportional relationship between the cups of flour a baker uses and the number of cookies made. A. What does the point (0,0) represent in th
PLEASE HURRY!!!! what was one result of the events reported in the excerpt above? F Germany financed the Mexican army’s attempted invasion of the united states
Reports produced by the United Nations are considered O relevant sources, -A O irrelevant sources. -B O biased sources. -C O disputed sources. -D
How does the caste system reinforce order and stability within Indian society?
can someone help me out? :P
8One fifth of a number plus three times the number is equal to twice the number plus 42. What is the number? Show your work
Who took over Akkadia?