If it takes 3 days for 10 workers to finish building one house, how many days will it take 15 workers to finish 4 houses?

Respuesta :

sirinda
sirinda sirinda
  • 19-10-2017
a = house
3 days x 10 worker = a
a = 30 work unit
4a = 120 work unit
120 work unit = 15 workers * y days
y = 120/15 = 8 days

i hope this isn't too confusing 
Answer Link

Otras preguntas

simplify. 6.2 (–1.9) a. –4.3 b. 8.1 c. –8.1 d. 4.3
you fly in a helicopter for 1 hour that goes at a speed of 240 km per hour how far did u go
the formula for the area of a rectangle is a=lw , where a is the area, l is the length, and w is the width . a rectangular garden has a length of 10 ft. its wid
Which of the sums below can be expressed as 7(4 + 9)? 28 + 9 28 + 63 7 + 63 11 + 16
594 miles in 9 hours
How to solve 3t - 7 = 5t, then 6t=
Which of the following is an example of how terrorism has changed in the 21st century?
jack wants to know how many families in his small neighborhood of 60 homes would help organize a neighborhood fund-raising party. He put all the addresses in a
Suppose a triangle has two sides of length 42 and 35, and that the angle between these two sides is 120. What is the length of the third side of the triangle?
What is true about discipline