Industry standard tools for scheduling and project management include pert, wbs, and ________.?

Respuesta :

BlueSky06
BlueSky06 BlueSky06
  • 03-06-2017
In my web search, there are actually more than three industry standard tools for scheduling and project management. Apart from what has been stated in this item, we also have the Gantt Chart. This was developed in 1917 and this tracks the tasks across time. 
Answer Link

Otras preguntas

1. Cotton, wool, silk are examples of ____________ .(a) Plant Fibres(b) Animal Fibres(c) Natural Fibres(d) Synthetic Fibres​
Each square below represents one whole. What percent is represented by the shaded area? %
Which equation represents a line which is parallel to the line 7y - 4x = -14?
Dude I literally have no idea what to do​
the length of a rectangular room is 16 less than four times the width. the perimeter of the room is 68 feet. find the length and the width​
Who is Moon Jae-in?ㅤ​
four more than twice a number is greater than negative eighteen. Solve the inequality for the unknown number
write the ratio in simplest form: 22:36=?
What's the structure of Cl2O? Is it polar or non-polar? Question options: A) Bent or angular, non-polar B) Trigonal planar, polar C) Bent or angular, polar D
Z ㄲ Respuesta: se necesitan 15 casos para las 4 lámincis. El primer 3 indica los 3 clavos para el lado izquierdo de la primera lámina. los números del L...4 ind