jahfarisamuel7757 jahfarisamuel7757
  • 18-07-2022
  • Business
contestada

Joshua is a new project manager. He is unsure of how much time a new task will require to be completed on the project. He decides to use ________ to estimate a realistic time frame for the task.

Respuesta :

HANicole HANicole
  • 18-07-2022

Answer: PERT

Explanation:

Answer Link

Otras preguntas

What is a process that increase the number of body cells in eukaryotes?
The amplitude on a transverse wave is A. the height of the wave. B. crest to crest. C. the speed of the wave.
How do you ADD and SUBTRACT fractions?
62 inches= blank feet
Paula is given a litre bottle of water during her fitness assessment at the gym. She drinks 375 millilitres of the water.    How much is left?
2t+7=-1 inverse the term without variable
What are 3 everyday exothermic reactions ??
what is the square root of 97? for my younger friend
After 14 boys leave a concert, the ratio of boys to girls is 3:10. If there are p girls at the concert, write an algebraic expression for the number of boys at
The graph of f(x) = |x| has been translated left 2 units and up 1 unit. If no other transformations of the function have occurred, which point lies on the new g