Respuesta :
It takes them 12 hours to design a total of 7 logos if they both start working at the same time
Rate
This is the amount per unit time.
Since one graphic designer takes 3 hours to design a logo. Her less experienced colleague takes 4 hours to design a logo, we need to find the rate at which the work is done.
- The rate at which the first graphic designer works is 1 logo/3 hours = 1/3 logo/hr.
- Also, the rate at which the less experienced colleague works is 1 logo/4 hours = 1/4 logo/hr.
- So, their combined rate r = 1/3 logo/hr + 1/4 logo/hr = (4 + 3)/12 logo/hr = 7/12 logo/hr.
Time to design 7 logos
Now, since we require the time to desigh 7 logos, this time is T = number of logos/combined rate
= 7 logos ÷ 7/12 logo/hr
= 12 hr
So, it takes them 12 hours to design a total of 7 logos if they both start working at the same time
Learn more about time here:
https://brainly.com/question/25173515