A certain job takes 2 people 50 hours to complete. How many people are needed to complete the job in 25 hours?

Respuesta :

ns97095 ns97095
  • 20-11-2021

Answer:

4 people

Step-by-step explanation:

Answer Link
diana061 diana061
  • 20-11-2021
Answer, 1. 50 divided by 2 is 25. So both people take 25 hours each to complete the job. Since it’s only a 25 hours job, it will only take 1 person to complete the job.
Answer Link

Otras preguntas

How to do mixture word problems????Like: A restaurant sells large and small sub sandwiches. Rolls for the sandwiches are ordered from a baker. The roll for a la
how do i answer 4+3 x 2 to the third power + 5 to the second power
v/w = 9 for w Please note that the dash between v and w means the fraction sign
A high school purchases two workbooks for every textbook, and two journals for every workbook. If the school purchases 301 total items, how many of each do they
Which statement is not true about an adverb?  A.It always ends in -ly. B.It usually modifies a verb.  C.It can modify another adverb. D.Its position in a senten
which is the most valid definition of a republican form of government?
Point A is 10 units to the right of the origin and 9 units down.  What are the coordinates of point A?
Describe how to transform the parent function y= x^2 to the graph of each function below. 1. Y= -2(x - 1)^2 2. Y= 3(x - 2)^2 + 3
Solve the equation and check your answer. 3-5b+2b=-2-2(1-b)
solve the simultaneous equation 5x+2y=114x-3y=18