Si 27 hombres terminan una obra en 16 días, ¿cuántos hombres se necesitarán para terminar la obra en 24 días?

Respuesta :

1028605
1028605 1028605
  • 16-03-2021

Answer:

hi

Step-by-step explanation:

Answer Link
Whalewarrior Whalewarrior
  • 16-03-2021

Answer:

18 hombres

Step-by-step explanation:

usaremos una ecuación para resolver

x/27 = 16

x= 27* 16

x=432

432/ h = 24

432/24 = h

h = 18

perdóname por mi mal español. No es mi primer idioma.

Que tenga un buen dia :)

Answer Link

Otras preguntas

does the water where the tea was dumped during the boston tea party protest still taste like tea?
Literary device where you write how people talk
Annie and him are taking turns driving on their trip. On one day they drove a total of 420 miles. Annie drove 3 times farther than Jim. How far did him drive?
is technology dumming the society?
________ results from agreement between marketing and operations as to which customers add the greatest advantage and profits over time. customer segmentatio
Classify the inequality as true or false
What is the meaning of -(-(-6))
what is the closest estimate to 2 times 19 times 51,15020012590
A rectangular rug is 12.5 feet long and 10 feet wide. The rug needs to be reduced by a factor of 1/5 to be placed near a door. What is the area of the reduced r
What musical element occurs when a rhythm of four is played over a rhythm of three?