Clc3343 Clc3343
  • 19-02-2021
  • Mathematics
contestada

jane takes 4 hours to do a job that Alice can do in 3 hours. if jane works 1/2 hour before Alice joins her, how long will it take the two of them to finish the job

Respuesta :

8j23santhoshri
8j23santhoshri 8j23santhoshri
  • 19-02-2021

Answer:

2.4 hours

Step-by-step explanation:

Answer Link

Otras preguntas

2.match upPicture plants​
what was the revealing of the winnipeg general strike?
A hollow object that amplifies sound waves is called a what?
Who had three big class rings, drank too much alcohol, had a sweet side at times and their parents spoiled it? outsiders​
PLEASE HELP ME!!!! I DON'T UNDERSTAND
Why is Conrad Grebel called the “Father of Anabaptists”?
which best describes the resolution of this story
01 – Write the correct form f the verbs in parenthesis and then, translate: (Escreva no espaço em branco a forma correta do verbo no presente simples e, na linh
Pls help me guys!! :)
Help me with the answers of 1.1 1.2 1.3 A