If 4 workers take 900 hours to finish a project, how long will it take 8 workers to
complete the same project?

Respuesta :

Kennedyboyd06 Kennedyboyd06
  • 21-01-2021

Answer:  450hrs

Step-by-step explanation: 4workers take time 900hrs

Therefore 1 worker complete in = 900/4

→ 3600hrs

then 8 workerz take time = 3600/8 = 450hrs

SO, ANSWER IS → 450hrs

Answer Link

Otras preguntas

The Chinese knew how to produce silk by about 2700 B.C. A.True B.False
how long did the Mayan century last?
Read the following sentence from the text: By general law, life and limb must be protected; yet often a limb must be amputated to save a life, but a life is nev
im doing a report and its on bejamin franklin and im filling out a paper and i want to know his middle name
which of the following represents the most accurate estimation of 65+77
How did apartheid lead to social conflict in South Africa?
Who were the two main opponents in the Peloponnesian War? A: Sparta and Athens B: Syracuse and Corinth C: Greece and Persia D: Ionia and Thessaly
the principal would like to assemble a committee of 8 students from the 15 member council. how many different committees can be chosen?
Penicillin is ordered for a child weighing 35 pounds. The average dose for an adult is 360 mg. The child will receive ________ mg
Water is considered a(n) _______ limiting factor. unimportant biotic abiotic and biotic abiotic