contestada

The type of budget that is prepared for the expected capacity level only is called a _______. static budget. flexible budget. continuous budget. master budget.

Respuesta :

Erudite1
Erudite1 Erudite1
  • 28-10-2016
The budget that is prepared for the expected capacity level only is called a fixed or static budget.
Answer Link

Otras preguntas

What causes the wind to blow
The mannerist approach to art reflected
You deposit $10 per month in a bank that offers an annual interest rate of 6%. At the end of three years, your balance is:
If the strength of the magnetic field at A is 64 units, the strength of the magnetic field at B is _____. 16 units 32 units 128 units 256 units
Simplify. Negative the square root of 2500. A. plus or minus 50. B. –25 C. 25 D. –50
Help! - For her Language Arts class, Gianna must choose one of 6 books and then give either an oral or written summary of the book. How many different ways can
what is the net cube what is the surface area of the cube of 5
When living off campus, one way to save money is to rent an apartment where: A)Appliances are excluded. B)Furniture is not included. C)Utilities are included. D
Henry Hudson’s voyage in 1609 along the Atlantic coast of North American is important because? A: he found a northwest passage to Asia B: the Dutch established
what percent of Earth's Liquid surface freshwater is found in rivers? A.) 0.9% B.) 2% C.) 11% D.) 87%