g3ab0ionDoomsanbs
g3ab0ionDoomsanbs g3ab0ionDoomsanbs
  • 16-10-2016
  • Social Studies
contestada

The basic plan-do-study-act (pdsa) cycle was first developed by
a. deming
b. shewhart
c. juran
d. fleming.

Respuesta :

booglagoose booglagoose
  • 16-10-2016
a Deming and combined with c juran
Answer Link

Otras preguntas

Which gigabit ethernet standard uses multimode fiber optic cabling and supports network segments up to a maximum of 550 meters long?.
Use the spelling word that best completes the sentence. Ralph had a look on his face when he got caught munching a cookie before dinner.
Use the image to answer the question: A trapezoid shape garden inside a rectangular mulch area. The garden has one base of 3.5 feet, one base of 5 feet, and a h
Stored procedures must have at least one argument. a. True b. False
Most exhibition shows open in the morning and close in the late evening. A study of Saturday arrival times showed that the average arrival time was 3 hours and
Keto Diet Does It Really Work ?
Which school of behaviorism asserts that intervening variables, in the form of hypothesized physiological processes, explain behavior?.
The change in an ecosystem that happens when one community replaces another as a result of changing abiotic and biotic factors is called.
what is the greatest common factor of the numbers 2835 and 8960
Yesterday, Charmaine went on a bike ride. Her average speed was 10 miles per hour. Today, she went on another ride, this time averaging 13 miles per hour. In th