4) How much concrete was required to make the Hoover
Dam? Where did this concrete come from?

Respuesta :

Аноним Аноним
  • 02-11-2020

Answer:

Three and one-quarter million cubic yards.The initial concrete required for the dam was mixed in a river-level mixing plant which was located approximately 3/4 of a mile upriver from the dam site This plant provided the concrete for the linings in the diversion tunnels and for the lower levels of the dam. It went into operation on March 3, 1932.

Explanation:

Answer Link

Otras preguntas

The store has 28 notebooks in packs of four. Three packs of notebooks are sold. How many packs of notebooks are left?
what is the probability that the first piece is red and the second piece is back
Please help me on this this is kinda hard
35% of the students at Grandy High School are freshman. If there are 525 Freshman, how many students are not freshman?
A movie theater sells student tickets for $5 and adult tickets for $10. On Saturday night, 2,500 people go to the theater and ticket sales total $18,000. How m
The fatty protective covering for neurons is _____.
Horace Mann is known mainly for
Biomes may be terrestrial aquatic or atmospheric true or false
Distinguishing the advocate and broker roles from each other is
How did Saul rule the people of ancient Israel? He conquered neighboring Judah and Canaan. He wrested power from Nebuchadnezzar. He united twelve tribes under o