Dan can tile a floor in 3 hours. his assistant could tile the same floor in 8 hours. if they work together, how long will it take to tile the floor?

Respuesta :

wolf1728
wolf1728 wolf1728
  • 18-08-2018

There is a formula for this:

Total Time = (worker1 * worker2) / (worker1 + worker2)

(3 * 8) / (3 + 8)

24 / 11 =

2.1818181818 hours


Answer Link

Otras preguntas

what is the simplified form of 12x squaroot 900x^2y^4z^6
What is the length of SM
An investment adviser prepares an advertisement that will be used in newspapers in a large city. under nasaa rules, the advertisement would be permitted to cont
An infant who had been choking becomes unresponsive. which action by the rescuer is appropriate?
____ parameters provide a one-way link between actual parameters and formal parameters.
My son wants to make and equilateral triangle eith sticks and strings. Explain how he could do this?​
A confused client is pulling at the iv line. when considering alternatives to restraints, which nursing intervention would be used first?
The function C(t) = 25.50t - 16.75 represents the cost of buying a certain number oftickets to the concert with a $16.75 coupon. The cost, C, is measured in dol
A vector field consisting of parallel vectors has a curl that is the zero vector. a. true b. false
1. what is the most effective transition to add the begining of sentence 6