With this contract type, contractors have the highest amount of risk of cost, and owners have the least:

A) Cost-plus contract
B) Fixed-price contract
C) Time and materials contract
D) Unit price contract

Respuesta :

Otras preguntas

What special burdens does Mari Djata suffer from as a child?
The cruise control on a car is an example of what process
Everyore will chpose their own costumea
The word CANDY can be spelled using just 2 letters. Can you figure out how? The word CANDY can be spelled using just 2 letters. Can you figure out how?
Events A and B are mutually exclusive. Suppose event A occurs with probability .33 and event B occurs with probability .38. Compute the probability that A occu
Cards are selected one at a time without replacement from a well-shuffled deck of 52 cards? until an ace is drawn. Let X denote the random variable that gives t
Inverse of f(x)= 2^3x + 1
A square on a large calendar has an area of 4220 square millimeters. Between which two integers is the length of one side of the square
110 hr =______d_______hr
Erin has 4 bags with 19 marbles each bag. she had 7 bags with 14 marble each bag. she give 23 marbles to her brother. how many marbles Erin have left?