The table shows the amount of time each member of a group spent finishing a project.
Member A B C D E F
Time (hr) 1 2 1.5 2 8 2
The time spent by member 
 is an outlier. Because of the outlier, the mean will be 
 than the median.
                                             
                                          
                                          
                                       