divyakanugula divyakanugula
  • 19-12-2022
  • Mathematics
contestada

An efficiency study conducted for a company showed that the number of devices assembled
by the average worker hours after starting work at 7 am is given by
N(1) = 6t³+ 18t12+ 45t for 0≤ ≤ 3. At what time during the morning shift is the average
worker performing at peak efficiency?

Respuesta :

Otras preguntas

What is the correct answer
How does the cell get rid of waste products like carbon dioxide
___________ was the new government established by Southern states that had seceded
why do the products of multidigit numbers with zeros & one digit sometimes have zeros in them & sometimes have no zeros in them?
During a game, Naomi lost points. She lost fewer Than 3 points. Use an integer to describe her possible score.
Delia has 493 stamps in her stamp collection she can put $0.16 on each page of an album how many pages can she fill completely
Read the poem. Throat is dry; weather’s hot. I buy a can and pop the top. I lift the can to trembling lips, And find relief With one cool sip. How many stanzas
explain the connection between social dawnism and human zoo
A mixture is a combination of two or more substances in which each substance retains its individual characteristics
Solve for x: x/6 = 12