Jitensuthar2008 Jitensuthar2008
  • 20-11-2022
  • Mathematics
contestada

18 workers can do a piece of work in 180 days. If two more workers join in then find the number of days in which the work can be completed.

Respuesta :

Otras preguntas

area and explanation thanks
What is the natural barrier between the subcontinent of India and the rest of Asia
The earth's layer of solid rock that flows under pressure is called the _____________.
When lipids are used as an energy source, which phase does the glycerol from them enter? a. glycolysis b. intermediate step c. kreb's cycle d. electron transpor
Damian set up a bucket to catch the raindrops. Buckets can hold 1 gallon. If each raindrop is made of about 1/90 fluid ounces of water, how many raindrops the b
The hα line (sec. 2.6) of a certain star is received on earth at a wavelength of 682 nm. what is the star's radial velocity with respect to earth?
Computer safety control settings are most often used to protect children. eliminate hacking attempts. block harmful content. cure viruses.
Which of the four activities is a batch-level activity?
Identify the number as​ real, complex, pure​ imaginary, or nonreal complex.​ (more than one of these descriptions may​ apply.)−1
A special olympics event has 12 more boys than girls competing the total number of participants is 1000 how many boys conpeted and how many girls competed