18 workers can do a piece of work in 180 days. If two more workers join in then find the number of days in which the work can be completed.

Respuesta :

Otras preguntas

How many solutions are there to the following system of equations? -3y = -2x - 6 3 = x
4,582 x 10 Written in place value form
Which of these mountain ranges represents the Appalachian Mountains? A) 1 B) 2 C) 3 D) 4
ans all these questions please​
reflect the x axis A B C D
Which characteristic would be most important when a scientist needs to study the changes in climate conditions over a five-year period? curious observant ethica
Mary takes 8 days to do a full check of the library's online catalog. Her assistant takes 12 days. If they work together, determine the fraction of the catalog
You have been identifying the sequence of a segment of a protein. The sequence to date is: leucine-methionine-tyrosine-alanine-glutamine-lysine-glutamate. You i
Helppppp The area of a rectangular parking lot is 6364 m². If the width of the parking lot is 74 m, what is its length? Length of the parking lot:
Read the passage below. Highlight or underline words and phrases that you feel are important to understanding the document. In the spaces provided, explain how